From high‑voltage distribution to ELV systems, DTE installs and tests cabling that meets the strict demands of data centres, pharma and industrial projects. Our self‑performing teams integrate seamlessly with your programme to reduce risk and keep commissioning on track.
HV/MV/LV/ELV cable pulls with segregation of power, OT & ICT. IR/continuity/earth-loop testing throughout.
Poor cabling is a leading cause of commissioning delay. Our process ensures every cable is installed, tested and signed off.
Using certified pulling equipment, calibrated test instruments and documented ITPs, we maintain quality at each stage. Works align to I.S. 10101/BS 7671 and client specifications, with on-the-spot RAMS updates to accommodate live programme changes.
Yes. We plan pulls, manage bend radii and coordinate containment interfaces to ensure safe, efficient installs.
Yes. IR, continuity and earth-loop testing are performed and logged during installation.
We segregate power, OT and ICT per standards and client requirements to avoid interference.
Yes. We provide temporary power and changeover support where required.
Test results, schedules, labels and photos are included in handover packs.